EME Power Systems Renewables
Tuesday 12th January, 2016
At EME Power Systems we have been busy accommodating our customers in the rush to ensure that their renewable energy sources are commissioned before tariff changes take effect.
At EME Power Systems we have been busy accommodating our customers in the rush to ensure that their renewable energy sources are commissioned before tariff changes take effect. In the last 3 months alone EME Power Systems have connected in excess of 10,000 kva of Anaerobic Digestion (AD), Solar & Wind generation to the distribution network or, to put it another way, enough energy to supply about 8,000 homes.
EME Power Systems Director, Robert Horn said:
"Any generation scheme of any significant capacity will require a high voltage metered electricity connection in order to connect to the distribution network operator's network. It will most likely also require an on-site private HV network of transformers & switchgear to complete the connection of the generating equipment to the network. These projects are an excellent example of where our Power Systems & Power Connections businesses operate together to provide a complete solution to the client. Our businesses provide a seamless electrical connection from the point(s) of generation through to the point of connection to the DNO's network. Generation export schemes are even more time sensitive than import only connections; OFGEM & generation tariff stipulations dictate that the connection be energised & "G59'd" to strict deadlines that have to be me - no exception, no excuse and any failure likely to result in seven figure consequential losses.
At EME Power Systems we understand that design & execution of that design to a high standard on its own does not equal success; the additional components of completing & G59ing to an agreed time line are also requirements of a successful project".
If you are an end client, consultant or a renewables provider and would like to discuss a generation scheme with an EME Power Systems engineer then we would be pleased to talk with you.
News Stories
- 21st Anniversary!
- WHO YOU GONNA CALL……
- Welcome Mark Baxter
- Overdue Maintenance
- University HV Fault
- Customer Feedback
- Larger Than Your Normal EV’s
- Taking the Biscuit
- Benefits of Furans Testing
- Aftermath of Storm Babet
- Emergency Response to Storm Babet’s Disruption
- Welcoming Samantha Collishaw and Reducing Carbon Footprint
- Ardagh Glass Transformer Replacement
- Considering Voltage Management to Help Cut Bills?
- Graham Haydn-Davies Retirement
- LV Sub-Main Fault
- Cable Joint Failure
- Phil Shaw Retirement
- Directional Drilling
- Pre-Planned Maintenance
- Energy Savings Factsheet
- The Benefits of Carrying Out Planned Preventative Maintenance (PPM)
- EME Transformer Stock Saves the Day!
- PARTIAL DISCHARGE TESTING
- Storm Franklyn
- Helping to Mitigate the UK Energy Crisis
- EME Power Systems Helps Company To Join The Recycling Effort
- Christmas Time Switchgear Changes
- Out of Hours Peace of Mind
- EME Power Systems Fast Response for Major Food Manufacture
- Importance of Regular Intrusive Maintenance
- NHS Challenge
- Automated Packaging at Malvern Worcestershire
- Christmas Arrives Early
- Challenge Accepted
- Through these uncertain times...
- Hayley Paddock Joins EME Power Systems
- Challenging Times
- Low Carbon Electricity
- Our excellent installation teams complete essential works
- Fast Response
- Essential Maintenance
- Solution to a tricky transformer replacement
- It's A Cut!
- EME Power Systems Quarterly Update
- Infrastructure Upgrade
- EME Power Systems Continue As Normal
- It's Cold Inside
- Double transformer failure leads to double success
- Steve Harrison Joins the Company
- Class Cancelled
- Now For Something Slightly Different
- Go Green and Save Pounds
- Cable Fault Repair
- ACB
- Time For A Quick Change Around
- Lincoln Prison
- An Early Summer Break - Out With The Old, In With The New
- EME Power Systems Midweek Break